Practical cabinet guidance
Nerro Support Centre
Choose the right cabinet system, order with confidence, and find practical guidance for delivery, installation preparation, and aftercare.
Browse support topics
Choose a topic and find a direct answer.
Get the practical details Canadian homeowners commonly check before placing a cabinet order.
Before You Buy
Choose a cabinet system and understand what Nerro supplies before you start adding products.
Can I choose and order Nerro cabinets directly online?
Yes. Start with Painted Cabinets or Euro Kitchen, then shop by cabinet type and add the required sizes, finishes, and quantities to your cart. Finishing pieces such as panels, fillers, toe kicks, and moulding are listed alongside the main cabinet categories.
Start with Painted CabinetsWhat is the difference between Painted Cabinets and Euro Kitchen?
Painted Cabinets pair shaker and slab-style fronts with a more traditional painted look. Euro Kitchen uses frameless construction and contemporary slab fronts in gloss, supermatt, and woodgrain-style finishes. Choose one system for a consistent construction and finish throughout the project.
Explore Euro KitchenDo the cabinets arrive assembled and include soft-close hardware?
Yes. Nerro cabinets are assembled before delivery and include soft-close doors and drawers as standard, so there is no flat-pack cabinet assembly step before installation.
Does Nerro provide kitchen design, on-site measurements, or installation?
Nerro supplies assembled cabinets and can answer product and ordering questions. Full kitchen design, on-site measurement, and installation are not included, so the layout, final dimensions, clearances, and installation requirements should be confirmed with your installer or contractor before ordering.
Measurements & Planning
Turn a confirmed layout into an accurate cabinet and finishing-parts list.
What should I have ready before choosing cabinets?
Have a dimensioned layout or cabinet list, appliance specifications, ceiling height, and the locations of doors, windows, plumbing, electrical, and vents. Confirm which cabinet sides will remain visible and where fillers, panels, toe kicks, or moulding are needed.
How do I turn my layout into an online order?
Work through the layout cabinet by cabinet. Match each position to the appropriate upper, lower, drawer, tall, sink, appliance, or corner category, then select the required size and quantity. Add the finishing parts last and compare the cart against the layout before checkout.
How should I measure my kitchen and appliances?
Measure wall-to-wall dimensions at more than one height and record ceiling height, openings, trim, plumbing, electrical, and obstructions. Use the appliance manufacturer's specifications rather than the appliance's nominal size, including required ventilation and door-swing clearances.
Who is responsible for checking final measurements?
The customer is responsible for the measurements and products ordered. Have the final layout, cabinet sizes, appliance openings, fillers, panels, and installation clearances checked by the customer, installer, or contractor before payment.
Cabinets & Components
Understand what is included and which finishing parts may need to be ordered separately.
Which pieces are usually needed for a complete cabinet order?
A typical kitchen may require upper, lower, drawer, tall, sink, appliance, and corner cabinets, plus finished panels, fillers, toe kicks, moulding, and decorative hardware. The exact combination depends on the confirmed layout and which surfaces remain visible.
Do exposed cabinet sides need finished panels?
Often, yes. Cabinet box sides and door fronts can use different materials or finishes, so a visible end may need a finished panel for a completed appearance. Check every end, island back, refrigerator surround, and dishwasher location against the product dimensions.
Shop Finished PanelsWhy do I need fillers and toe kicks?
Fillers create clearance at walls, corners, and beside appliances so doors and drawers can open correctly. Toe kicks finish the recessed area at floor level. Neither should be omitted simply because the cabinet run fits the measured wall length.
Are handles, pulls, and interior accessories included?
Decorative handles, pulls, organizers, waste bins, and other accessories are separate unless the product page specifically states they are included. Review each product description and add the required hardware or accessories before checkout.
Shop AccessoriesAre handle holes pre-drilled?
Do not assume decorative-hardware holes are pre-drilled. Confirm the product details before ordering, then have the installer position and drill handles only after checking door swing, alignment, and the selected hardware's hole spacing.
Will colours and finishes match exactly?
Screen colours are only a guide. Painted, wrapped, and melamine components can reflect light differently even when they are intended to coordinate, and small variation between materials or production batches can occur. View current samples in person when colour matching is critical.
Ordering & Payment
Check the cart carefully, understand checkout, and know when to contact the team.
How do I place a cabinet order?
Choose a cabinet system, shop each cabinet category, select the required size and options, and add the correct quantity to your cart. Add panels, fillers, toe kicks, moulding, and accessories, then compare the full cart with the confirmed layout before checkout.
What should I review before paying?
Check the collection, door style, colour, cabinet width and height, handing where applicable, quantities, finishing parts, accessories, delivery address, phone number, and postal code. Resolve any uncertainty before submitting the order.
How are taxes and delivery charges calculated?
Applicable taxes and available delivery charges are calculated using the information entered at checkout. Enter the final Canadian delivery address and review the complete order total before payment.
Can I change or cancel an order?
Contact Nerro immediately if you notice an error. Changes or cancellation may be limited once processing or production begins, and made-to-order or selected products may have return restrictions. Review the current policy before payment.
Review the refund policyProduction & Delivery
Plan timing, access, unloading, and inspection for a large assembled-cabinet delivery.
Where are Nerro cabinets made?
Nerro cabinets are assembled in Oshawa, Ontario. Local assembly supports factory-direct ordering and allows cabinets to be delivered assembled rather than flat-packed.
How long do production and delivery take?
Production timing can change with order volume and product requirements. Delivery timing also depends on the destination, so check the current Production Time page and leave enough flexibility before booking demolition, trades, or installation.
View current production timeHow do I confirm delivery availability and cost?
Enter the final Canadian delivery address at checkout to review the available delivery information. Remote areas, islands, ferries, and locations outside regular service zones may require confirmation before ordering.
Email a delivery questionWhat should I confirm for a condo, apartment, basement, or difficult-access home?
Confirm the delivery level and drop-off point, elevator booking, loading dock rules, stairs, doorway widths, parking, and any building insurance requirements before ordering. Assembled cabinets are bulky, and special access or carry-in service should never be assumed.
What should I do when my cabinet order arrives?
Have an adult available, clear a safe route and dry storage area, and follow the carrier's unloading instructions. Count the pieces, inspect visible packaging and cabinet condition, note concerns on the delivery record when possible, and take photos before moving or installing affected items.
Installation & Aftercare
Protect the cabinets, prepare the site, and document any issue before installation.
Does Nerro install the cabinets?
No. Nerro supplies assembled cabinets and ordering support, but installation is not included. Customers should arrange a qualified installer or contractor and confirm the site is ready before delivery.
How should I prepare for cabinet installation?
Confirm final measurements, appliance specifications, wall and floor conditions, plumbing and electrical locations, fillers and panels, and the installation sequence. The room should be enclosed, dry, and ready before cabinets are brought in.
How should cabinets be stored before installation, especially in winter?
Keep cabinets upright in a clean, dry, temperature-controlled indoor area and protect them from snow, rain, construction moisture, and direct heat. Do not leave them in an unheated garage or outdoors. Follow your installer's guidance for acclimatization before installation.
What warranty is included?
Nerro cabinets currently include a five-year warranty. Coverage may depend on the product, installation, use, care, and the nature of the issue, so customers should keep their order information and contact Nerro for confirmation.
Ask about warranty coverageHow do I report damaged or missing items?
Stop before installing or modifying the affected item. Take clear photos of the packaging, full cabinet, close-up issue, and product or order reference, then contact Nerro promptly. Keep all packaging until next steps are confirmed.
Email supportAre minor finish variations or touch-ups normal?
Small differences in sheen, grain, texture, or colour can occur between painted, wrapped, and melamine components. Minor installation touch-ups may also be part of normal finishing work. Photograph any concern before installation so Nerro can determine whether support is required.
How should I clean cabinet doors and boxes?
Use a soft damp cloth and mild soap, then dry the surface promptly. Avoid abrasive pads, harsh chemicals, steam, standing water, and excessive moisture around seams and edges. Test any cleaner in an inconspicuous area first.
Current information
Details that may affect your order.
Keep changing operational information on dedicated pages so customers always reach the latest version.
Still need help?
Get help before you place your order.
Contact the Oshawa team with a product, measurement, delivery, or order question.